Known public record details
Location summary
Public records currently place this well in Ward County, PHANTOM (WOLFCAMP) field, survey UL, abstract U67, block 17, section 28. Surface locations can be incomplete or misleading for horizontal wells, so verify official plats, directional surveys, completion records, and source documents before relying on a map point.
UTL 2806B 02H
Derived lateral/wellbore geometry is available for this well from parsed public directional survey records.
Wellbore paths are derived from parsed public directional survey records. They are not official property, tract, or legal boundary lines. Verify critical decisions with official source records.
Survey, Block & Section Crossings
Surface location
Wellbore path: No cached survey/block/section crossings are available yet
Survey/block/section crossings have not been generated for this wellbore cache yet.
No cached survey/block/section crossings are available yet
No cached land-grid crossing rows are available for this geometry yet.
Survey, abstract, block, and section crossings are derived from public GIS polygons and parsed wellbore geometry. They are approximate and are not official parcel, mineral-title, ownership, or legal-boundary determinations.
Well lifecycle timeline
Permit records can indicate requested drilling, recompletion, deepening, or related work, but do not guarantee drilling or production.
Directional surveys, plats, and L-1 records can be important for understanding horizontal wells beyond the surface point.
Completion filings can show that a well moved from permitted or drilled status into a completed well record.
Production signals help identify wells with linked monthly production or derived producing status.
P-4 activity can indicate operator, lease, gatherer, purchaser, or responsibility changes tied to the record.
Plugging notices and plugging records help distinguish planned plugging from wells already reported as plugged.
Recent activity timeline
Directional survey
L-1 electric log
P-16 acreage designation
Permit 905621 resolved from recent W-1 document.
Effective November 1, 2025-03. Lease UTL 2806B.
Potential test date December 1, 2025-01. Calculated 24-hour rate: oil 1306 bbl, gas 1231 mcf, water 3276 bbl. Test period: oil 1306 bbl, gas 1231 mcf, water 3276 bbl.
Recent source documents
Related wells from the same lease, operator, field, or county
Ward County - JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U67 - Block 17 - Section 28
Ward County - JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U67 - Block 17 - Section 28
Ward County - JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U67 - Block 17 - Section 28
Ward County - JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U67 - Block 17 - Section 28
JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U85 - Block 21 - Section 45
JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U84 - Block 21 - Section 44
JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U84 - Block 21 - Section 44
JAGGED PEAK ENERGY LLC - PHANTOM (WOLFCAMP)
Survey UL - Abstract U84 - Block 21 - Section 44